Barry Williams joined Ramboll in 2006, becoming Principal Engineer in 2014. He is currently Mersey Gateway Technical and Project Team Scheme Consultant.

Barry’s wide ranging design, project management and site management experience has been built up within the highways sector, having worked in the design office and on site for the contractors’ and designers’ teams, fulfilling highway and highway structures design project/ construction management and designers site liaison roles.

His wider experience covers a broad section of civil engineering works such as earthworks, drainage, pavement, utilities, signs and road markings, lighting and retaining walls including reinforced earth and anchors. He has also gained extensive knowledge of setting up and operating/auditing quality assurance systems.

Projects have included new roads in environmentally sensitive areas, motorway improvement and re-surfacing schemes, on-line road improvement schemes, both with significant traffic management input, structural investigation and repair works and also rail infrastructure works, with both temporary and permanent structures adjacent to operational network rail infrastructure. Including:

  • Mersey Gateway - Technical Advisor to Mersey Gateway Crossings Board (MGCB)/CH2M and Core Team Highways Lead Technical Advisor and Project Team Scheme Consultant. Responsible for:
    • The review and management of highways and highways related design submissions and Departure from Standard Applications relating to highway geometry and highway details.
    • Site Assurance and Site Monitoring duties undertaken on behalf of the MGCB as well as the provision of general technical advice.
    • Managing the Ramboll contract with CH2M and any arising additional works through the NEC Professional Services Contract.
  • Highways Agency Area 10 - Ramboll Project Manager for all works assisting Balfour Beatty Mott MacDonald JV BBMM. Under an NEC Professional Services Contract, Ramboll assisted BBMM in preparing designs for maintenance schemes across the Area 10 network including pavement, VRS, drainage and structures works.
  • A477 St Clears to Red Roses Improvements - Design Team Project Manager for the construction phase of the works for 8.7km of off-line carriageway, 0.8km of online improvements and de-trunking of the existing A477 between Llanddowror and Red Roses.
  • A487 Glandyfi Improvement - Project Manager and Employers Agent Supervisor for £16m highways improvement at Glandyfi.
  • Wrexham Industrial Estate Access Road - Design Team Assistant Project Manager/Designers Site Representative
  • River Usk Bridge Re-grounding Works - Project Manager
  • Kronospan Rail Sidings- Design Team Project Manager & Employers Supervisor for the construction phase
  • A470 Blaenau Ffestiniog to Cancoed Improvement- Assistant Designers Site Representative
  • Central Park Redevelopment, Manchester – Contractors Senior Engineer

Recent projects

Tate Modern

Officially opened on 17th June 2016 the new Tate Modern extension later named the Blavatnik building is an iconic world-class addition to London’s skyline. Enabling new ways to display Tate's collection, the new building has been instrumental to Tate Modern's recent success, as it topped the polls as the UK's most visited attraction in 2018.

Pulkovo Airport

Work began on Pulkovo Airport in March 2008 to deliver Grimshaw’s winning architectural concept, whilst keeping the existing Pulkovo Airport fully functioning. As the lead design consultant, Ramboll helped to create a world leading airport terminal conforming to international best practice, in parallel with restrictive Russian standards.


Greenwich Millennium Village phases 3, 4 and 5

We produced a tender devised to promote a competitive overall costing by designing for three alternate methods of construction. This placed the contractor in a strong position to secure the most economic solution.

Green Mountain Project

The Green Mountain Project for a Sustainable Future was a development initiative led by the Engineering Consulting Office for Utilities (ECOU) in partnership with a consortium of international consultants led by Ramboll UK. In 2009, ECOU was one of the main engineering consulting practices in Libya involved design on major projects. Its work included urban and regional planning, and investigations supporting the designation of protected areas and national parks.

The project's overall objectives were to provide the local population of Al Jabal Al Akhdar (Green Mountain) area on Libya's northeast coast, with infrastructure and income as well as protect the region's natural and cultural assets, both of which are important for quality of life and tourism. Impetus for the project spr ...

Ramboll Group A/S

Ramboll Group A/S
Hannemanns Allé 53
DK-2300 Copenhagen S
Denmark
Tel:+45 5161 1000
Fax:+45 5161 1001

Mail: info@ramboll.com

Danish CVR numbers

Danish CVR numbers

Ramboll Group
10160669

Rambøll Danmark
35128417

Ramboll Energy
35128417

Rambøll Management Consulting
60997918

Other sites

Other sites