The new North Zealand Hospital

Contact

Steven Bentley

Steven Bentley

Consulting Director, Buildings
T: +44 7970 046 046

About the project

The new North Zealand Hospital rethinks previous hospital designs, increasing the focus on social, economic and environmental sustainability. The 115, 000 sqm hospital is based on a vision of the healing architecture and is shaped like a clover to create coherence between form and function. The design focuses on the patients’ wellbeing to aid a quick recovery by creating a pleasant place for patients and visitors through the seamless connection between architecture and nature

Key challenges 

The building has been designed to meet the Danish Building Classification 2020 while a DGNB gold certification of the buildinghas been prioritised by the client.Thiswill make it one of the most energy efficient hospitals ever to be builtThe building resides on a low-lying site where the control of rainwater run-off has been especially challenging and resulted in a sustainable drainage design comprising swales and ponds to limit the rainwater run-off from the site. 

Outcomes

Ramboll functions as engineering and project management consultant, providing a range of engineering services including sustainability consultancy. The building is designed with an airtight façade, making it highly sustainable with its energy efficient design.Besides including more than 5,000 m2 photovoltaic panels, the building also includes a variable air volume mechanical ventilation with high-efficiency heat recovery.  

Ramboll Group A/S

Ramboll Group A/S
Hannemanns Allé 53
DK-2300 Copenhagen S
Denmark
Tel:+45 5161 1000
Fax:+45 5161 1001

Mail: info@ramboll.com

Danish CVR numbers

Danish CVR numbers

Ramboll Group
10160669

Rambøll Danmark
35128417

Ramboll Energy
35128417

Rambøll Management Consulting
60997918

Other sites

Other sites