King Edward Point

King Edward Point. Image: Kate Bunting

King Edward Point. Image: Kate Bunting

Contact

Dave Grove. Ramboll

Dave Grove

Director, and government lead
T: +44 7841 498 236
Ramboll. Kate Bunting

Kate Bunting

Associate
T: +44 7929 058 253
This sub-Antarctic island is a haven for wildlife and the facility located here, provides long-term monitoring studies of seals, penguins and other seabirds as well as conducting fisheries research for the GSGSSI sustainable fisheries. 

Under the Antarctic Infrastructure Modernisation (AIM) Programme, which will transform how BAS enables and supports frontier science, Ramboll as Technical Advisors to BAS has provided specialist engineering and consultancy services to design improved berthing and mooring facilities for BAS’s ships, survey boats and GSGSSI’s fisheries patrol vessels. The new wharf will be suitable for berthing the new RRS Sir David Attenborough and mooring smaller boats. A new slipway will provide access to the boathouse and an upgrade to the small boat facility will enable the continued safe and efficient launch and retrieval of the existing small boats that undertake harbour patrols and marine research.

Extensive stakeholder engagement with BAS operational and logistics teams and Masters of existing BAS ships and GSGSSI ensure all user requirements have been considered in the final design solution. Ramboll undertook analysis based on bathymetric and topographic survey information to determine the required extent of the new berth that would give adequate under-keel clearance for the new RRS Sir David Attenborough. 

The final concept design solution is a wraparound structure, with a single mooring dolphin. The single mooring dolphin enables the bow of the RRS Sir David Attenborough to moor safely without impeding the existing small-boat operations. The under-keel clearance was further optimized by tapering the berthing face of the wharf, and positioning the mooring dolphin in shallower water, thereby reducing the quantity of steel and rock fill required. The wharf design team has also used offsite prefabrication and optimised resources across the scheme to prevent the introduction of non-native species to the area.

Due to the lack of ground information available, an innovative caisson with shallow embedment design was developed using complex modelling software. Interpretation of the existing structure also provided sound evidence to mitigate the geotechnical risks.

Detailed design and construction will be undertaken by BAS’s Contractor Partner BAM and site supervision undertaken by Ramboll and BAS. Construction is scheduled to take place between January and May 2020 during the Austral summer season. All works will be carried out with permission granted by the GSGSSI following submission of an Environmental Impact Assessment.



Ramboll Group A/S

Ramboll Group A/S
Hannemanns Allé 53
DK-2300 Copenhagen S
Denmark
Tel:+45 5161 1000
Fax:+45 5161 1001

Mail: info@ramboll.com

Danish CVR numbers

Danish CVR numbers

Ramboll Group
10160669

Rambøll Danmark
35128417

Ramboll Energy
35128417

Rambøll Management Consulting
60997918

Other sites

Other sites