The impressive facility is among the largest advanced wastewater treatment plants in the world, providing over 320 tons of dried biosolids daily that are beneficially reused by the community.
Ramboll’s solution included design, construction and permitting for a new leachate treatment facility with a sequencing batch reactor biological system for the removal of ammonia and reduction of chemical oxygen demand.
The program demolished 50 buildings, renovated and repurposed over 500,000 square feet of manufacturing and office space and made significant modifications to the site’s infrastructure.
For over two decades, Ramboll has been a partner to Spotsylvania County in implementing cost-effective solutions to optimize operations and improve quality of water for the community.
Ramboll developed sustainable solutions for the US Military Academy at West Point, collaborating with the owner / operator and its contractor for the first phase of design through construction.
Moving the Pinheiros River closer toward recovery with improved water quality, liveability and reduced odor.
Ramboll supported installation of one of the nation’s largest at the time industrial GAC treatment systems to remove contaminants including PFAS from a petrochemical facility’s process wastewater.
Ramboll provided services to upgrade one of the largest water treatment plants in the US that removes PFAS to meet potable water quality requirements, and helped secure 100% cost recovery from the US federal government.
Ramboll assisted NYSDEC to evaluate and prioritize over 1,750 solid waste sites statewide to determine potential impacts from PFAS and 1,4-dioxane, including groundwater sampling and analysis at over 100 inactive landfills.
The new water treatment plant uses modern filtration technology to save energy, while ensuring a safe and reliable water supply for the region.
Ramboll develops a model for intelligent waste water handling, which enables cleansing of a larger amount of waste water as well as cost savings for the waste water sector.
Led by Ramboll Studio Dreiseitl in Beijing, Ramboll has been selected to do the landscape and eco water design of a visionary project: The Tencent Innovation City in China.
Ramboll is the lead consultant on a comprehensive project on establishing of a new treatment plant in the city of Skellefteå which ensures high-quality drinking water to all inhabitants.
Ramboll has delivered technical assistance to regional authorities for provision of water and sanitation service and facilitate the decentralisation process in three regions: Sikasso, Mopti and Koulikoro.
Ramboll’s experience with industrial water use makes us uniquely positioned to provide the combination of investigative experience and engineering skill to assist clients in meeting water efficiency goals.
This project consists of a detailed road and traffic management design, for a new traffic solution at Nørreport Station - including a new bus station.
Ramboll developed the first PFAS stormwater criterion protective of groundwater, resulting in clean community drinking water, and helped our client save over $20 million and minimise liabilities.
Involving the upgrade of the motorway network through widening of existing three lane carriageway to four lanes over a length of 25km, this Highways Agency Early Contractor Involvement (ECI) contract was the first where the target cost came in below scheme budget. It is also notable for being the first UK motorway widening scheme to be constructed using a moveable steel barrier traffic management system instead of a contra flow.
The growth in the frequency and severity of extreme rainfall has significantly increased the risk of flooding from rivers and urban drainage systems of insufficient capacity. It is a huge investment to dig into the earth and expand the sewer systems in urban areas, so other measures may prove to be better and cheaper alternatives.
Breathing new life into Woolston Eyes nature reserve by developing 38 hectares of wetlands across two new sites.
A 25-year undertaking, the remediation and restoration of the Onondaga Lake Superfund Site is one of the largest and most complex remediation programs in the US.
Sometimes doing nothing can be the most costly option – both in environmental and financial terms. Representing 3.5 million residents, Jeddah officials have realised that swift action is needed to make the city more liveable in the future. Ramboll established a cost-benefit analysis and crafted a masterplan to ensure future sustainable development for Jeddah.
This master plan will provide the vision and framework for economic, social and government based projects over the next 30 years. The creation of the Fujairah Strategic Masterplan Project is an initiative of the Government of Fujairah and will set a framework for the growth and development of the Emirate of Fujairah until 2040.
With its unique positioning and an area covering the size of 625 football grounds, Nordhavnen (or Nordhavn) in Copenhagen, Denmark, is Scandinavia's largest and most ambitious city development project for the time being. The overriding vision for Nordhavnen is to become the sustainable city of the future.
Ramboll is giving expert advice in how to build a railway tunnel, and how to improve the punctuality and the frequency of future rail traffic in Stockholm.
Ramboll was lead engineer for Cobham Motorway Service Area, a 20ha development on an environmentally sensitive greenfield site.
Thorough and correct decision-making needs to be based on well-documented facts. When it comes to deciding whether or not to spend large sums of money on environmental remediation, for instance, it is vital to have a professional consultant who can document the details of the environmental pollution.
Ramboll’s Eco Green City masterplan in Tbilisi, Georgia exhibits cost-efficient infrastructure and world-class liveability for residents.
Site 8 is the first major building of the Carlsberg city development complex in central Copenhagen. The complex is more than 100, 000 sq m and combines the teaching facilities of the UCC university with retail, office and residential uses. The area will be active 24/7 and will engage with in excess of 10,000 students per day creating a vibrant and active study environment.
The world leader in the offshore wind industry, Vestas was looking to create an R&D facility to prototype and test its new wind turbine design. With 80m long blades, the V164 turbine is a huge leap in wind technology. Each turbine is set to generate...
The project for “Nordhavnsvej” is the first stage of a new road to Copenhagen’s Nordhavn (North Harbour). When fully developed, the urban area is planned for 40,000 residents and 40,000 workplaces.